The project
Our specialists delivered and installed a light crane system with two bridges.
We equipped the system has with electric chain hoists PS-GP 500/1 NF. A well-qualified service team hung the chain hoists on manual trolleys.
We have completed the project for a customer from the metal-forming industry.
The challenge
The whole structure had to fit in a very tight space. Our technicians positioned and assembled the system between two machines.
The light crane system finds its application in supplying steel elements to adjacent machines.
Technical data
Lifting capacity 500 kg
Overall length 11 000 mm
Bridge width 4 800 mm
Lifting height 5 000 mm