Description
FEM group:
1Bm (M3) = 150 stops per hour/ 25% / 400 man hour
1Am (M4) = 180 stops per hour/ 30% / 800 man hour
2m (M5) = 240 stops per hour / 40% / 1600 man hour
3m (M6) = 300 stops per hour / 50% / 3200 man hour
4m (M7) = 360 stops per hour / 60% / 6400 man hour
Synchronised electric chain hoist is a good solution for transporting large and bulky loads. Ideal, precise parallel run of two hooks prevents from twisting the load. Two electric chain hoists are connected with each other electrically and mechanically. Perfect to combine with suspended crane or travelling crane
Equipment of the synchronised PS GPS electric chain hoists:
- stop limits
- protection class IP 33
- temperature monitoring (Klixon) to protect the motor against overheating
- special gear grease conforming hygiene standards required in food industry
- distance between load hooks 0.7-5.0 m
- optional: frequency inverter
- optional: trolleys in configurations: 2x push trolley or 1x push trolley and 1x electric trolley
- optional: customised devices for bulky load handling
Model | Voltage | FEM group: 1Am (M4) - capacity [kg] | FEM group: 2m (M5) - capacity [kg] | FEM group: 3m (M6) - capacity [kg] | FEM group: 4m (M7) - capacity [kg] | Lifting speed (50Hz) [m/min] | Chain multiplication |
---|---|---|---|---|---|---|---|
PS GPS 500/1NF | 3-fazowe | 2x630 | 2x500 | 2x400 | 2x320/ 2x250/ 2x200/ 2x160/ 2x125 | 8/2 | Single |
PS GPS 500/1SF | 3-fazowe | 2x320 | 2x250 | 2x200 | 2x160/ 2x125 | 16/4 | Single |
PS GPS 500/2NF | 3-fazowe | 2x1250 | 2x1000 | 2x800 | - | 4/1 | Double |